Projects
CATEGORY:
Railways
STATUS:
ongoing
CLIENT:
Rail Vikas Nigam Ltd
VALUE:
872.10 Cr
FEATURES:
Earth work, Bridges, P.Way, Passenger aminities
LOCATION:
BARWADIH-TORI (JHARKHAND)
COMPLETED DATE:
--
Construction of Roadbed, bridges, supply of ballast installation of track (excluding supply of rails, and tracks sleepers), Ekectrical (General Electrification), Provision on OHE, Signaling and telecommunication work in connection with 3rd Line Barwadih(excluding) km 258.51 and Tori (including) Km 185.30 (Total 73.21 Kms) in Dhanbad Division of East Central Railway, Jharkhand, India
Construction of Roadbed, bridges, supply of ballast installation of track (excluding supply of rails, and tracks sleepers), Ekectrical (General Electrification), Provision on OHE, Signaling and telecommunication work in connection with 3rd Line Barwadih(excluding) km 258.51 and Tori (including) Km 185.30 (Total 73.21 Kms) in Dhanbad Division of East Central Railway, Jharkhand, India