
Projects
CATEGORY:
Railways
STATUS:
completed
CLIENT:
Rail Vikas Nigam Limited (RVNL), Raipur
VALUE:
242.73 Cr
FEATURES:
Earthwork, Minor Bridges, Buildings, P.Way and OHE
LOCATION:
Bilaspur Division, Chhattisgarh & Madhya Pradesh
COMPLETED DATE:
30/06/2019
Balance work of construction of roadbed, major and minor bridges and track linking (excluding supply of rails and sleepers, thick web switches and special sleepers), and OHE & general electrical work in connection with doubling between Salka Road–Khongsara (25.8 km) and Khodri–Jaithari (47.8 km) on Bilaspur Division of South East Central Railway, Chhattisgarh and Madhya Pradesh.

Balance work of construction of roadbed, major and minor bridges and track linking (excluding supply of rails and sleepers, thick web switches and special sleepers), and OHE & general electrical work in connection with doubling between Salka Road–Khongsara (25.8 km) and Khodri–Jaithari (47.8 km) on Bilaspur Division of South East Central Railway, Chhattisgarh and Madhya Pradesh.