CATEGORY:
Railways
STATUS:
completed
CLIENT:
RITES Ltd, Raigarh
VALUE:
269.28 Cr
FEATURES:
Earthwork, Minor Bridges & P.Way
LOCATION:
NTPC STPP – Khargone, Madhya Pradesh
COMPLETED DATE:
31/10/2019
Earthwork in railway formation including filling and cutting, blanketing and construction of bridges, P-way track linking works including supply of railway track ballast and P-way materials (excluding supply of rails) in connection with railway infrastructure to serve Khargone STPP (2×660 MW) for NTPC — balance work of Package III (Ch 24.00–28.00 km) & Package IV (Ch 28.00–29.90 km).

Earthwork in railway formation including filling and cutting, blanketing and construction of bridges, P-way track linking works including supply of railway track ballast and P-way materials (excluding supply of rails) in connection with railway infrastructure to serve Khargone STPP (2×660 MW) for NTPC — balance work of Package III (Ch 24.00–28.00 km) & Package IV (Ch 28.00–29.90 km).